VSKYLABS Contraventus UPDATE LOG HISTORY

Update Log

VSKYLABS 'Contraventus' research prototype.

JetManHuss - VSKYLABS (c) 2024 All Rights Reserved


XP12 - v3.3.1 (21st March 2026)

  • Updated documentation structure:
    • All project documentation transferred to the Contraventus section in the VSKYLABS Aircraft Center.
    • Updated included documentation.
  • Removed Skunkcrafts updater:
    • Product updates are no longer supported via Skuncrafts Updater.
    • The most updated version of the product is available via the user-account at the store.

XP12 - v3.3 (3rd April 2024):

  • Updated airfoils.
  • Fix to battery slow-recharging bug.
  • Minor adjustments for PBR renderings in the cockpit.
  • Fix to transparent elevator animation bug.

XP12 - v3.2 (4th December 2022):

  • Interior lighting system reset and retuned to comply with the modified X-Plane 12.00r1+ lighting engine.

XP12 - v3.1 (23th November 2022):

  • Updater software replaced - from STMA to SkunkCrafts. 

XP12 - v3.0 (September 2022):

  • X-Plane 12 initial version released.

XP11 - v2.5 (4th December 2019):

  • Flight Dynamics Model:
    • Descent speed has changed to one which holds the highest lift over drag ratio...this is around ~17 knots give or take, the recharge efficiency indicator will get on the 'green' and should be used along with sink rate monitoring (should fluctuate between -350 to -150 feet per minute...in average).
    • It is possible to do the climb outs with full power at ~17-20 knots...however, the recommended shallow climb may be managed with reduced power, and almost the same rate of climb.
    • Solar panels are now working side by side with windmill recharge - Solar panels are not effective at night, so flying *into* the night is the most probable approach in prolonged endurance flight.
    • Online manual was updated accordingly.

XP11 - v2.1 (9th November 2019):

  • Flight Dynamics Model:
    • Compatibility update for X-Plane 11.40 (including Experimental flight model environment).

XP10 - v1.0 (2015): Project initiated and released.